Summary
Model of process plant south of Toamasina
The plant is designed for an operating life of over 27 years. With closure
of the Ambatovy mine, the plant could continue to process ore from other
mines that may be developed either within or outside of Madagascar.
Risks to the plant from high winds and cyclones will be mitigated by a
combination of detailed engineering design and appropriate emergency
response protocols. Best management practices will be utilized for the
construction and operation of the plant to ensure the health and safety of
the workers and people near-by. Similarly, high environmental
standards will be established for operations. All water and air emissions
will be managed to meet regulated criteria.
Key Impacts and Mitigation
Main issues identified through consultation and through the professional
experience of the Malagasy and international EA team included:
•
concern about air emissions that would affect peoples’ health and
about greenhouse gas emissions;
•
concern that the design of the plant has accounted for extreme
natural events, including cyclones;
•
optimization of local hiring and use of local businesses to serve the
needs of the plant;
January 2006
Ambatovy Project — 28