Ambatovy eBooks - page 5

3
2012 - AMBATOVY SUSTAINABILITY REPORT
About us
The mine site
total footprint:
1,800 ha over the life of the mine
location:
Moramanga
life of mine:
approximately 29 years
The pipeline
length:
approximately 220 km
location:
runs from the mine to the plant site
annual capacity:
transport 6 million tonnes of ore
The plant site
size:
320 ha industrial complex
location:
Toamasina
annual capacity:
60,000 tonnes of refined nickel, 5,600 tonnes of refined cobalt and 210,000 tonnes
of ammonium sulphate
Ambatovy is a large-scale nickel and cobalt mining enterprise in Madagascar, comprised of a lateritic mine near
Moramanga and a processing plant in Toamasina. The two sites are linked by a pipeline of approximately 220 km in
length. With production of fully refined nickel and cobalt now underway, Ambatovy is poised to become one of the
world’s largest lateritic nickel mines and Madagascar’s leading industrial partner.
Project Sites
1,2,3,4 6,7,8,9,10,11,12,13,14,15,...52
Powered by FlippingBook