Conformity Table of EA with the Terms of Reference (Continued)
ONE Terms of Reference
Section of EA
Sequential reclamation and re-vegetation of mine during operations
Volume B, Section 6
Mitigation of mine water run-off and plant site tailings discharges
Volume B, Sections 3.2, 3.8 and 3.9;
Volume E, Sections 3.2, 3.8, 3.9 and 3.10
Opportunities to extract other mineral by-products at the plant
Volume D, Section 2
Re-use and re-furbishing of equipment after project use is finished
Volume H, Appendix 7
Raising usefulness of restored areas (i.e. for fauna habitat)
Volume B, Sections 4.1 and 6
Socio-economic spin-off effects
Sections 5.1, Volumes B - F
Actions to be taken if mining operations cease either permanently or
temporarily
Sections 6, Volumes B - F
Compensation for unavoidable residual impacts: i.e. biological
(offsite mitigation) or social
Volume B, Section 4.1; Volume G, Section 3.4;
Sections 5.1, Volumes B – F
Measures to maximize attainment of positive impacts
Volume B, Section 5.1
5.3 All project impacts and cumulative effects
Combine all project elements together and then also with other
projects
Volume G
5.4 Risk and hazard analysis
For all main project components
Volume I, Section 6.1; Volume H, Section 6;
Natural Risk Sections in Volumes B - G
5.5 Safety measures and emergency planning
Volume H, Section 6
Safety measures for all sites
Volume H, Section 6
Emergency response plans for all sites
Volume H, Section 6
II-6 Environmental Management Plan
Monitoring plans and schedule to meet regulatory compliance; also
to confirm effectiveness of mitigation where high uncertainty existed
in impact analysis; physical, biological and social
Volume H, Section 6
Mitigation implementation schedule and adaptive management
feedback
Volume H, Section 6
6.1 Planning phase: closure plan if project does not proceed
Volume H, Section 6
6.2 Construction phase: monitoring
Volume H, Section 6
6.3 Mining phase: monitoring
Volume H, Section 6
6.4 Closure phase: monitoring
Volume H, Section 6
II-7 Project Synthesis
The project, impacts, mitigation and compensation summary;
including reference to sustainable development and Dynatec’s
environmental and social policy
Summary; Volume A, Sections 1 to 4;
Volume H, Section 2
January 2006
Ambatovy Project — A-5